Its going to take me some time to build this so i figured why not start with diagrams. Everyone is more than welcome to critique my cads. the more help i get the better i can fine tune. Ill post a link directly to the picasa page because it doesnt always appear larger enough when posting the pics directly.
http://picasaweb.google.com/krislewis76/Clone#
I think im set on the firebox. 1/2" for the fire area and bottom portion of chute, 3/8" for the ash box and transition box.
This part will take a lot of fine tuning. Im thinking of new stuff every day, and changing it.
Soon enough ill start the actual build(hopefully within the next two to three weeks).
Side note. This is my first week using autocad so ive crashed coursed myself. Bear with me.
kris
http://picasaweb.google.com/krislewis76/Clone#
I think im set on the firebox. 1/2" for the fire area and bottom portion of chute, 3/8" for the ash box and transition box.
This part will take a lot of fine tuning. Im thinking of new stuff every day, and changing it.
Soon enough ill start the actual build(hopefully within the next two to three weeks).
Side note. This is my first week using autocad so ive crashed coursed myself. Bear with me.
kris