View Single Post
Old 06-05-2008, 09:20 PM   #1
Norcoredneck
somebody shut me the fark up.
 
Norcoredneck's Avatar
 
Join Date: 07-11-06
Location: Norco, Ca.
Default If a Redneck wanted to build a UDS

Ok here is how he would do it. Not that this is the right way or the only way but how I would do it. Will add steps as I complete them.

Divide drum into 3 sections





Layout grill holes.
I chose 1 3/4"" and 8" from top. You should assess the drum you are using.



Layout Intake holes.
I chose 2" from bottom.



Layout Gauge hole.
I chose 9" (1" below lower rack)



Centerpunch marks.



Drill pilot holes.







Drill holes for Intake nipples
I use 1" which lets you thread 3/4" nipple (clean round hole)







Drill out holes for Grate supports
I am going to use 1/4" bolts. I use Unibit to get clean holes in thin metal.





Open up hole for gauge.
I use 3/4" hole which is a tight fit for a 1/2" pipe thread.





Thread in 3/4" close nipples
I use cap to protect threads and screw in as far as possible.
This link will show alternative to welding nipples.
http://www.bbq-brethren.com/forum/sh...2&postcount=40



Weld in Nipples





Install 3/4" ball valve.

__________________
Low and Slow.....

The Prontologist is in...
Ok let's see your Butt!

Last edited by Norcoredneck; 06-06-2008 at 08:35 PM..
Norcoredneck is offline   Reply With Quote


7 members found this post helpful.
Thanks from: --->