View Single Post
Old 11-07-2013, 10:03 PM   #33
GSXR883
Knows what a fatty is.
 
Join Date: 10-28-13
Location: Wonder Lake, Il
Default

Quote:
Originally Posted by Paul B View Post
Do you have a material list?

Paul B
SS UDS
I have had a number of people ask so here is the material list.

I live in North Eastern Illinois and bought everything at Menards. After totaling everything up it will cost more than I put in the original post. About $120. I had some of these items already so my cost was less.

Material and quantity

1" x 6" x 6' Tongue & Groove Carsiding 20
2" x 3" x 8' Stud or Better Lumber 8
1" x 4" x 6' Standard Pine Board 2
Titebond III Ultimate Wood Glue 8 ounce 1
#8 x 2" Phillips Flat Head Wood Screws 50 pc 2
16D Common Nail - 1lb Box 1

14" Charcoal Kettle Grill 1 or heat source of your choice.

4" Strap Hinge Sold as a 2 pack 2
Hook & Eye 3

Tools required:
table saw
miter saw
jig saw
circular saw
cordless drill
hammer
wood clamps
drill bit
square
level
tape measure
pencil

There are some assumptions that you have a general understanding of carpentry.
Reader assumes all responsibility and liability.
__________________
AKA Bacon King Of Wonder Lake. LG BGE, Custom Built Smoke House
GSXR883 is offline   Reply With Quote


Thanks from: --->