View Single Post
Old 11-16-2008, 12:00 AM   #1959
madams144
Found some matches.
 
Join Date: 10-28-08
Location: New Orleans, LA
Downloads: 0
Uploads: 0
Default New Arrival - First Build Complete

As mentioned yesterday .. today was our build; A buddy from work and myself tackled our 2 drum project today and came up winners!

Photos of the job attached.

Summary; these were new open top drums, no liner. We burned them with a weed burner to remove outside paint and any undesireables from the drum factory. We burned them till they turned blue.

Currently both drums are in the seasoning stage overnight .. big plans for these two new arrivals.

Again, thanks for all the good ideas from the UDS user group.
Attached Images
File Type: jpg Burnout 1.jpg (62.7 KB, 1204 views)
File Type: jpg Burnout 2.jpg (61.6 KB, 1203 views)
File Type: jpg Burn Finished.jpg (39.4 KB, 1204 views)
File Type: jpg Paint Prep.jpg (42.3 KB, 1206 views)
File Type: jpg Ready For Fire.jpg (71.9 KB, 1212 views)
File Type: jpg Assembled.jpg (99.6 KB, 1202 views)
File Type: jpg Final 1.jpg (55.6 KB, 1375 views)
File Type: jpg Final 2.jpg (28.9 KB, 1223 views)
File Type: jpg Seasoned.jpg (67.7 KB, 1212 views)
File Type: jpg Up to Temp.jpg (33.4 KB, 1220 views)
madams144 is offline   Reply With Quote