View Single Post
Old 08-13-2010, 10:47 AM   #137
Smiter Q
is One Chatty Farker
Smiter Q's Avatar
Join Date: 05-05-10
Location: Austin - TX

The point was very tender, the probe slid right in and out like butter. The flat was not tender however, I had to stick the probe in and it had some decent resistance. So I put the lid back on and checked it again in an hour. It still wasn't quite ready so I waited another hour, then it was done and tender in both the flat and the point. So this packer took 12 hours at 250 to get done.

IS there a concern about drying out the point, while you waited another two hours for the flat?
Thanks and thanks for this awesome tutorial.
Brian: Weber: OTG + Lime Performer - - Keeping the Armor On - Eph. 6:11
Smiter Q is offline   Reply With Quote