View Single Post
Unread 07-25-2010, 10:08 PM   #67
Phrasty
Babbling Farker
 
Phrasty's Avatar
 
Join Date: 01-19-08
Location: Jamaica
Downloads: 1
Uploads: 0
Default

Spent pretty much the entire day on the firebox door. Had to fabricate the choke and grind the diamond ridges on the door smooth in order for the choke to slide and seal properly, that was very time consuming. I threw a small handle to push the choke open or closed with my fire stick. Hopefully I can mount the door and fit the seals tomorrow. Oh yeah, I also cut the coal grate to size.

Here are the updated pics.

Cheers
Attached Images
File Type: jpg screen-capture-313.jpg (50.3 KB, 1072 views)
File Type: jpg screen-capture-311.jpg (85.0 KB, 1075 views)
File Type: jpg screen-capture-306.jpg (80.1 KB, 1071 views)
File Type: jpg screen-capture-307.jpg (75.2 KB, 1073 views)
File Type: jpg screen-capture-308.jpg (94.8 KB, 1072 views)
File Type: jpg screen-capture-309.jpg (93.3 KB, 1070 views)
File Type: jpg screen-capture-310.jpg (78.0 KB, 1074 views)
Phrasty is offline   Reply With Quote